Projects & inspiration overview References Project configurator Photo montage Construction tips
Products overview Roof systems Façade systems Roof drainage Solar panel systems Flood protection solutions Coils and metal sheets
Resources overview Project configurator Photo montage Order brochures Request a guarantee certificate Trade fairs Questions and answers Your PREFA contact For installers For architects
Benefits overview Building material aluminium Special topics
Company overview About us Job offers News Press
Contact overview Your PREFA contact Contact form Order brochures
References overview Case studies Architecture Highlights Renovation Gallery
Construction tips overview Roof renovation Facade design Wood & Aluminium Façades Coverings for every roof shape Lightweight metal roof
For installers overview My PREFA Login Academy Advertising Material, logos & product samples Instruction and demonstration videos
For architects overview Experience PREFARENZEN Order our architectural brochure and architect folder Download centre BIM
Building material aluminium overview 40-Year guarantee Sustainability Complete System Storm-proof
Special topics overview Fire protection Listed buildings
About us overview Facts and figures Our values and goals Sustainability
Double-lock standing seam roofing is to be planned and executed according to structural requirements (relating to building and site).
PREFALZ solar panels 500 and 650 are designed for double-lock standing seam roofing in coil widths of 500 mm and 650 mm. If PREFA fixed clips, PREFA preformed sliding clips, PREFA preformed long sliding clips and PREFALZ solar panel clamps are used professionally in combination with PREFALZ solar panels, the thermally induced change in the length of PREFALZ
Panels is still guaranteed.
The determined tray width and the statically determined maximum spacing between clips must be taken into account during installation. In order to meet the static requirements of the solar panels clamped to the fold, the following specifications must be observed:
For more information on double-lock standing seam roofing, see the PREFALZ installation manual.
You can only download content from one product category. If you require content from multiple categories, please create a separate download for each product area.