Installation guidelines
Installation guidelines
Please select one or more chapters to download.
Table of contents

General information

This installation manual is suitable only for persons who have experience working with aluminium and related processing tools. The manual describes a general, standard installation, which must then be adapted to local conditions.

  • Order-related materials may not be returned or exchanged.
  • Please handle all packages with care when transporting (see Storage and Transport).
  • All profile lengths must be checked before installation so that you can adjust for potential tolerances before installation.
  • Structural requirements must be taken into account.
  • Secure sheet metal parts to the scaffolding to prevent them falling off or being blown away during high winds.
  • Siding & siding.X and perforated siding must be installed on a supporting structure either made of timber or metal.
  • Check the stability, accuracy and suitability (material compatibility) of the substructure before you begin the installation.
  • Any unevenness in the substructure must always be smoothed out before installation.
  • You must ensure that the joints are able to change in length when exposed to differences in temperature without being subject to stress.
  • The siding, siding.X and perforated siding must be attached to the sub-structure framework using the fixing materials recommended by the manufacturer.