Line out

  • 230 mm enables waste-free work on the verge.
  • The remainder (half the roof tile) can be reused.

The initial lacing takes place in the middle of the roof or on the verge. The starter strip depends on the intended partitioning. The vertical bevel is either grooved (Variant B) or in the middle between two grooves (Variant A). The horizontal line is always laid 419 mm from the upper edge of the panel. The cord to be cut vertically must be divisible by 301 mm. In practice, after 5 panels (1,505 mm) or after 10 panels (3,010 mm), a coloured line deduction is made vertically. Make sure that the lacing runs in a straight line over the entire length.

1 Front edge of PREFA roof tile
2 Cut edge of PREFA roof tile
3 Verge 30 mm

Edge: The 30 mm up to the cutting edge should not fall into a wave crest.

1 Starter strip for PREFA roof tiles
2 starter flashing
3 Supply air grille made of perforated aluminium strip
4 Hem board

5 Fully supported substrate (at least 24 mm)
6 underlay
7 Counter batten
8 rafters