Installation guidelines
Installation guidelines
Please select one or more chapters to download.
Table of contents

Installation

  • Push the rhomboid façade tile 29 × 29 into the folds, and adjust to the vertical lacing (Fig. 1 and 2).
  • Fasten the rhomboid roof tile 29 × 29 to the punched-out notch using a clip and a supplied 2.8/25 grooved nail (standard fastening) (Fig. 3). No clips may be placed on the lateral rebates that run diagonally downwards (danger of capillary action).