Installation guidelines
Installation guidelines
Please select one or more chapters to download.
Table of contents

Start of machining

  • Unloading the panels: do not slide the panel over the panel lying beneath it, instead, lift it down carefully. At least three people or a suction lifter may be required, depending on the size of the panel.
  • Do not process the panel on the floor but on a suitable, flat and clean workbench.
  • Take the panels to the dry processing site at least 24 hours before the start of processing (recommended minimum temperature: 18 °C).
  • Remove any machining chips that could remain on the workbench.
  • Use suitable safety and personal protective equipment: Hard hat, hearing protection, safety glasses, gloves, protective footwear, etc.
  • When machining the panels, observe the applicable safety instructions for the tools being used.